One-stop Production
Author:      Source:      date:2016-05-07

Production Security System

 一、Production Capacity Description

Superiorities: 

1. We own EPS polystyrene board production lines. We are capable of conducting effective control on unit weight, quality and various parameters of core materials.

2. We have electrostatic coating production lines. We can have various options for the color of electrostatic coating steel parts according to customer demands.

3. We are one of the highly automated producers among modular house operators.

List of Large-scale Equipment

No.

序号

Equipment Name

设备名称

Quantity

数量

Remark

备注

1

Color steel coreboard composite production line

彩钢夹芯板复合流水线

3 lines

3

 

2

Full automatic color steel single tile production line

全自动彩钢单瓦生产线

2lines

2

 

3

Color steel slitting machine

彩钢分条机

2 sets

2

 

4

Steel plate shearer

剪板机

2 sets

2

 

5

CNC bending machine

数控折弯机

3sets

3

 

6

Full automatic thin-wall cold-bending molding machine unit

全自动薄壁冷弯成型机组

5 sets

5

C60-C160 regular specification

C60-C160常用规格

7

CNC punch

数控冲床

5 sets

5

20T-80T

Currently, our production and supply capabilities are as shown below:

Processing capability:

Monthly processing capability (square meters)

月加工能力(平方米)

Currently signed projects (square meters)(October 1 to 31)目前已签项目(平米)(101-31日期间)

Production and supply management personnel (unit: person)

生产、供应管理人员(单位:)

Production workers(unit: person)

生产工人(单位:)

Composite board production line

复合板生产线

30

12

20

120

3

Decomposition items:

Production item

生产项

Daily processing capability

日加工能力

Occupied production capacity by currently signed projects (November1 to 31)

目前已签项目占用产能

(111-1131)

Monthly production capability

月生产产能

Composite board

复合板

15,000 square meters

15000平米

300,000 square meters

30万平米

450,000 square meters

45万平米

Steel components for modular house活动房屋钢件

10,000 square meters

10000平米

120,000 square meters

12万平米

30,000 square meters

30万平米

  二、 Production Process Flow Chart

  HR Assurance Measures

1. According to the determined field management institution, build up a project construction management, and choose a high quality of construction management team and operation team for the construction of the project.

2. According to the characteristics of the project, the quantity and construction schedule requirements, determine the plan on labor requirements of every stage of construction. Organize labors to enter into the field in accordance with construction schedule and plans.

3. In terms of workers, shall choose workers with rich construction experience and select construction teams by priority. When it comes to workers coming into the field, shall do a good job in education and technical hand-over involving security, technology, fire prevention and civilization construction. Workers are allowed to take the post after pre-job training. Construction personnel of special type must attend the training and have the certificate of approval.

4. Conduct technology, safety, ideology and legal education for workers to make them set up the correct thought of quality first and safety first; abide by relevant construction and safety technical regulations; comply with local public security laws and regulations. Do a good job in worker legal education and civilization construction education, put an end to illegal and criminal actions and establish a good image of our company.

5.Do a good job in civilization construction, environmental protection education and legal education before workers entering into the field; handle in-and-our permits in accordance with regulations and make effective measures and those who without the permit shall not be allowed to enter the field. 

6. Life and logistics support: before a large number of workers coming into the site, we must arrange logistics work properly and take employers clothes, food, accommodation, transportation and medical care into full consideration, and implement these items seriously so as to fully mobilize the workers enthusiasm on production.

7. Construction personnel of special type must attend the training and have the certificate of approval. Welders must conduct trail welding under site conditions and be allowed to go to work after qualified.

      
Previous:No Data
National hotline:13705008558
All rights reserved © 2016 ICP: 12021570号-1 Technical Support:HaiXiaSiDu
Headquarters address:11th floor,Xin rixian Building,No.98-1 Jiangbin East Avenue,Fuzhou,China
Fuzhou factory:Qingxia Road, Qingtang Economic Development Zone, Lianjiang County, Fuzhou City
Beijing factory:Qigezhuang Town Industrial Zone, Dachang County, Langfang, Hebei
Email :http://mail.chinashuren.com